Installed
Hardware commissioned at the site.
Deliverable Compute
MTYCHE is developing qualification software to help AI infrastructure teams verify how much installed capacity can still be delivered after changes to racks, power, cooling, or firmware.
The AI delivery gap
An operating change can affect different parts of this chain. Qualification determines which capacity has current evidence for the operating conditions that matter.
Hardware commissioned at the site.
Capacity supported by evidence for a defined operating scenario.
Workloads served within service-level objectives.
Why now
A rollback can restore software state. Stored heat continues to dissipate, battery wear accumulates, and a command already sent to another system may already have taken effect.
After a change, the engineering question is what evidence still applies and what needs to be tested again.
The next decade
AI infrastructure investment earns returns through service the facility can sustain. The operating evidence between installed capacity and delivered workloads becomes more valuable as sites grow and change more frequently.
Facility electrical capacity.
PUE gives context on facility energy overhead.
Current engineering evidence supports a defined capacity after a change.
Count requests meeting service targets. Utilization and pricing inform returns.
PUE compares total facility energy with IT equipment energy over a defined period. Goodput is the rate of requests meeting configured service objectives. NVIDIA AIPerf also reports goodput per watt of GPU power. Engineering qualification uses evidence for the current configuration and operating conditions.
U.S. Department of Energy · PUE NVIDIA AIPerf · SLO metricsOur technology
EnergyOS and AgentSafe are in development. They apply a common discipline: review the evidence available for the current configuration and identify where more verification is needed.
OEM rack requalification
Review a change to cooling, power, components, or firmware. Identify which earlier results can be kept and which tests should run again.
Agent effect & audit
Compare action acknowledgments with evidence of external effects. Flag outcomes that remain unverified.
Trace where inference requests wait, then check replayed timelines against tail-latency objectives.
How we start
Run a scoped, offline engineering review. We work from historical records with read-only access and leave live equipment control with your team.
Pilot deliverables include a record of the change, the evidence to keep, and a list of checks to rerun or investigate.
Start with the retesting time and bench effort for one engineering change.
Extend evidence review to changes in production operations and agent outcomes.
Aim to assemble operating evidence that buyers and investors can independently check.
Contact
Describe one past rack or infrastructure change to review.
Investor and strategic briefRequest the nine-slide, non-confidential investor brief. We review each request before sharing the deck. If diligence involves confidential material, we arrange an NDA first.
We use the details you submit to respond to your inquiry. Please share a brief, non-confidential description.
YUNGFU@MTYCHE.COM